E4303
Wiring Methods
International Residential Code, 2024 · Chapter 43, Class 2 Remote-Control, Signaling and Power-Limited CircuitsRead the full text (opens UpCodes in a new tab)
Every 2024 IRC section and the IBC as it loads, by number or topic, plus the local rules for your city. Free to search.
Detached houses, duplexes and townhouses up to 3 stories with their own exits use the IRC; every other building uses the IBC (IBC 101.2).
E4303
International Residential Code, 2024 · Chapter 43, Class 2 Remote-Control, Signaling and Power-Limited CircuitsRead the full text (opens UpCodes in a new tab)
IBC 405.9
Works withIBC 905
International Building Code, 2024 · Chapter 4, Special Detailed Requirements Based on Occupancy and UseRead the full text (opens UpCodes in a new tab)
R322.1
International Residential Code, 2024 · Chapter 3, Building PlanningRead the full text (opens UpCodes in a new tab)
P2710
International Residential Code, 2024 · Chapter 27, Plumbing FixturesRead the full text (opens UpCodes in a new tab)
R303.7
International Residential Code, 2024 · Chapter 3, Building PlanningRead the full text (opens UpCodes in a new tab)
IBC 202
International Building Code, 2024 · Chapter 2, DefinitionsRead the full text (opens UpCodes in a new tab)
IBC 3202.4
Works withIBC 3301IBC Chapter 33
International Building Code, 2024 · Chapter 32, Encroachments into the Public Right-of-WayRead the full text (opens UpCodes in a new tab)
R606.3.6.1
International Residential Code, 2024 · Chapter 6, Wall ConstructionRead the full text (opens UpCodes in a new tab)
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.