Reclaim Your Margin.
Built for User Intelligence & Quality.
Design a permit-ready, bank-ready custom home plan without architect fees. Built4UIQ checks it against the IRC and your city's code, prepares your permit packet, and keeps your build's money in view.
No account needed to start designing.
Drag across the drawing to measure in feet. Keyboard: focus the drawing, arrow keys move one foot (Shift for five), Enter sets the start and end points, Escape clears.
Swipe sideways to see the whole sheet.
- Project
- Sample residence · 4,488 sq ft
- Program
- 3 bed · 2.5 bath · study
- Sheet
- Floor plan
- Sheet number
- A2.0
- R319.2.1Bedroom 03 egress 5.9 sf ≥ 5.7, pass
- R313.1Great room ceiling 14′-0″ ≥ 7′, pass
- §35-506Front setback 27′ ≥ 25′, pass
- R302.5.1Garage door 20-min, self-closing, pass
- R319.2.3Bedroom 02 sill 46″ > 44″ max, needs revision
Stakeholder ecosystem
Tailored Products for Every Building Stakeholder.
Select your persona to explore dedicated architectural command tools, real-time risk mitigation, and automated financial rails.
Project command & AI feasibility
Homeowners & individual builders
Eliminate GC markup opacity and permit risk. Take complete control of contractor interactions, automated drawdown schedules, and code-compliant schematic generation.
- Floorplan Schematic Design: Code-compliant floor plans & 3D models
- Regulatory Guidance: Instant zoning & site permit alerts
- Escrow Control: Milestone-based budget releases (with a participating lender)
- Live schematic audit
- Live
- Zoning compliance
- Verified (88%)
- Permit packet
- Ready to file
Trade operations & payment velocity
Contractors & subcontractors
Eliminate plan rejections, automate COIs and protect project profit margins. Get paid when a milestone is verified, not 60 days later.
- Multi-Project Builder Workspace: Every build, license and COI in one place
- Municipal Permit Packets: City-specific documents per project
- Escrow Payouts: Release on verified milestones (with a participating lender)
- Live escrow status
- Live
- Proof submitted
- 14 photos · 1 video
- Milestone
- Verified
Permit review & inspections
Municipalities & plan reviewers
A zero-cost tokenized portal for fast-track code compliance reviews: lot-specific checklists, stamped engineering sheets and pre-audited exemption affidavits in one click.
- Pre-Screened Submissions: Applicable code sections identified
- Inspections: Tied to project milestones
- Reviewer Control: Every decision stays with your staff
- Live permit queue
- Live
- Pre-screened
- 4 of 4
- Flags to review
- 6
For municipalitiesPermit review & inspections
Complete permits reach your desk.
Most permit delays start with an incomplete submission. Built4UIQ checks each packet against the IRC and your local ordinances before it is filed, so your reviewers open a complete submission with the applicable code sections already identified.
Built for permit clerks, plan reviewers and field inspectors. Access is view-only and tokenized, so there is nothing to install, and every decision stays with your staff.
- Pre-Screened Submissions: Applicable code sections identified
- Inspections: Tied to project milestones
- Reviewer Control: Every decision stays with your staff
- No Cost to Your City: Free tokenized access during the trial period
Submitted
The owner or pro files a lot-specific packet through Built4UIQ, built from their plans and site.
Pre-screened
The packet is checked against the IRC and your local ordinances. Applicable code sections are identified and gaps flagged before it is filed.
Your reviewYour staff
Your staff open one complete submission, then approve, comment or send it back. Built4UIQ never approves a permit.
Inspected
Inspections are scheduled against project milestones, and each result is recorded on the project for everyone to see.
In every packet
- Lot-specific code checklist
- Stamped engineering sheets
- Pre-audited exemption affidavits
- City-specific documents such as ResCheck, Manual S & J and tree canopy
Where it's live
The regulatory database is loaded one jurisdiction at a time. San Antonio and Austin, Texas are the first supported; other cities can ask to be next.
Everything an owner-builder needs to get to permit.
No percentage of your build. Your account is free.
Ready-for-Permit Floorplans
Code-compliant, lot-specific 2D plan package and renderings.
3D Home Visualization
See the home in 3D before you build it.
Municipal Permit Packet
Ordinance research, setbacks and every city-specific document.
Bank-Ready Spec Suite
Line-item budget and bid packages formatted for underwriting.
Build & Draw Portal
Milestones, draw requests, receipts and lien waivers.
Pay pros when the work is proven.
With a general contractor, markup is opaque and trades wait 60–90 days. With Built4UIQ, each milestone is checked against code and inspection before money moves.
Illustrative. Paying each trade directly from escrow requires the project's construction lender to participate through Built4UIQ; otherwise draws follow your lender's standard process.
For homeowners, contractors & tradesComing soon
One card for your whole build.
The Built4UIQ co-branded spending card puts materials and everyday build costs on one card, for the owner building the home and the pros building it.
- No Built4UIQ fees
- Materials and everyday build purchases
- For homeowners, contractors and trades
Planned. Issued through A Day Early Inc. Approval, limits and card terms are set by the card provider and subject to their eligibility rules.
Lenders and insurers Phase 3
Real-time risk scoring, audit-ready digital draw packages, automated lien tracking, the UIQ Score API and subcontractor COI monitoring.
Reclaim Your Margin.
Free to sign up. No credit card required.