Every exterior wall gets at least one continuous water-resistive barrier behind the siding and deck ledgers: No. 15 felt, ASTM E2556 wrap, foam WRB systems or tested alternatives.
Felt and house wrap run horizontally, lapped 2 in at horizontal seams and 6 in at vertical joints.
Unconditioned sheds and playhouses skip the barrier if the siding is on bare studs, the walls are uninsulated and unfinished inside.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.