Luminaires aren't raceways unless listed, except end-to-end assemblies carrying one 2-wire or multiwire circuit plus one more for the fixtures (NEC 410.64).
In Seismic Design Category D0 to D2, masonry or concrete chimneys are reinforced per Table R1001.1 and Section R606.
Local review: San Antonio sites are normally Seismic Design Category A or B, so chimney reinforcing and anchorage are usually not required; confirm the SDC for the site in Table R301.2.
Steel joists get bearing stiffeners at every bearing (except lapped joists with no wall above), sized to the wall stud above, at least the joist depth less 3/8 in long.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.