Where R-38 is required, R-30 over the whole ceiling counts if it runs full height over the top plate at the eaves; likewise R-38 for R-49. Not for the U-factor or UA routes.
Crushed Stone Footings for Cast-in-Place Concrete Foundations
Crushed stone footings may support non-retaining cast-in-place walls for houses in SDC A to C and townhouses in A or B.
Under 140 mph, stem walls on crushed stone are at least 6 x 12 in with two No. 4s in Exposure B (bracing lines 28 ft max), or 8 x 18 in with three No. 4s in C and D (25 ft).
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.