Precast foundation walls are engineered, approved before install with loads, footing, bearing, SDC and wind speed shown, and carry a third-party inspection label.
Duct insulation and linings: flame spread 25 and smoke 50 max (spray foam outside ducts in attics and crawls may reach smoke 450 with an ignition barrier); no burning at 250 F; labels every 36 in with maker, R-value and indices.
Open-top broilers get a 28-gauge metal hood as wide as the unit, 1/4 in below combustibles, with 24 in from the cooking surface to combustibles, unless listed for use without a hood.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.