More Efficient Thermal Distribution System Options
Distribution credits: ductless or hydronic inside, all ducts and equipment inside, at least 80 percent inside, low duct leakage (2.0 or 1.75 cfm/100 sq ft), or room airflow balanced within 20 percent.
Ducts buried in ceiling insulation are R-8 with at least R-19 of insulation around them; in zones 0A-3A supply ducts are fully buried at R-13 with a vapor retarder (R-8 in unvented attics with diffusion ports), except the last 3 ft.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.