Basement walls are insulated per the table unless the basement is unconditioned with an insulated floor above, no exposed ducts, pipes or registers, and insulated, sealed stair walls and doors.
More Efficient Thermal Distribution System Options
Distribution credits: ductless or hydronic inside, all ducts and equipment inside, at least 80 percent inside, low duct leakage (2.0 or 1.75 cfm/100 sq ft), or room airflow balanced within 20 percent.
Prescriptive slab-edge insulation runs down from the top of the slab to the table depth (not past the footing), outward insulation is covered by paving or 10 in of soil, and full-slab insulation is continuous.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.