A permanent energy certificate is posted near the furnace or utility area (not covering panel labels) listing R-values, window U and SHGC, test results, equipment, solar PV, ERI score, code edition and path, and any solar-ready zone.
Every building or dwelling unit is blower-door tested at 50 Pa (RESNET 380, ASTM E779, E1827 or E3158) after all penetrations are sealed, with a signed report; heated private garages may be visually verified instead.
Ventilation flow is tested and verified per RESNET 380 with a signed report; short 6 in range hood runs and systems with built-in flow readouts are exempt.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.