Prescriptive slab-edge insulation runs down from the top of the slab to the table depth (not past the footing), outward insulation is covered by paving or 10 in of soil, and full-slab insulation is continuous.
The permit report gives the address, analyst, software and version, all inputs, and a certificate of component values, leakage assumptions and equipment; without a site-specific run, use the worst orientation.
Compact hot water credit: no more than 16 oz of water in the pipe from the nearest hot source to each fixture; recirculation loops need demand control and a dedicated return.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.