Service-entrance conductors on or entering buildings are insulated, except some bare grounded conductors in raceway, cable or direct burial (NEC 230.41).
Over grade: 10 ft at the service entrance, drip loop and pedestrian areas; 12 ft over residential property and driveways; 18 ft over streets and truck areas (NEC 230.24(B)).
Local review: CPS Energy sets its own meter, service-drop and point-of-attachment requirements in San Antonio; check its service standards alongside these.
Multiwire circuit conductors are grouped by ties or markers in the panel unless the cable or raceway makes the grouping obvious (NEC 200.4(B), 210.4(D)).
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.