In unfinished basements and crawl spaces, NM/SE cable of 2-#6 or 3-#8 and larger may run on joist bottoms; smaller goes through bores or running boards; wall runs may be sleeved, sheath 1/4 in into the box and secured within 12 in (NEC 334.15(C)).
Pool, spa and hot tub wiring in corrosive areas uses the permitted methods (RMC, IMC, PVC/RTRC, LFNMC, limited LFMC and MC, short cords); elsewhere Chapter 38 applies (NEC 680.14, 680.21, 680.23).
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.