Skip to content

Search the building code.

Every 2024 IRC section and the IBC as it loads, by number or topic, plus the local rules for your city. Free to search.

Detached houses, duplexes and townhouses up to 3 stories with their own exits use the IRC; every other building uses the IBC (IBC 101.2).

A random sample from 6,919 sections for San Antonio, TX, the 2024 IRC and IBC

Show another sample
  • IBC 202

    Oxidizer

    • A material that readily gives up oxygen or promotes combustion: Class 4 can explode and severely speeds burning, Class 3 severely speeds burning, Class 2 moderately, Class 1 barely.

    Works withIFC

    International Building Code, 2024 · Chapter 2, DefinitionsRead the full text (opens UpCodes in a new tab)

  • IBC 1404.3

    Vapor retarders

    • Frame walls get an interior vapor retarder per Tables 1404.3(1)–(4) or a hygrothermal design; climate zone from IECC Chapter 3. Not needed in zones 1–3, basements, below grade, or in zones 4–8 where Table 1404.3(5) exterior insulation is used.
    • Class I ≤0.1 perm (polyethylene, foil); Class II >0.1–1.0 perm (kraft-faced batts, vapor retarder paint); Class III >1.0–10 perm (latex or enamel paint).
    • Zones 1–2: Class III only. Zone 3: II or III. Zone 4 (not marine): II, or III per Table 1404.3(3). Marine 4 and 5–8: I, II, or III per Table 1404.3(3). A responsive retarder is allowed anywhere.
    • Class III allowed with vented cladding over WSP/fiberboard/gypsum (zone 4–5; fiberboard/gypsum only in 6), or continuous insulation over 2×4 / 2×6: zone 4 R-2.5/R-3.75, 5 R-5/R-7.5, 6 R-7.5/R-11.25, 7 R-10/R-15, 8 R-12.5/R-20.
    • Zone 3 R-2; zones 4–6 R-3 (2×4) / R-5 (2×6); 7 R-5 / R-7.5; 8 R-7.5 / R-10.
    • Exterior continuous insulation of at least R-4.5 (zone 4), 6.5 (5), 8.5 (6), 11.5 (7), 14 (8), with ≤R-5 inboard and a ≤1 perm layer on the outside of the wall.

    Works withIECC

    International Building Code, 2024 · Chapter 14, Exterior WallsRead the full text (opens UpCodes in a new tab)

  • R506.2

    Post-Tensioned Slab-on-Ground Floors

    • Post-tensioned slabs on expansive or stable soil are designed to PTI DC10.5.

    Local review: Post-tensioned slabs are common in San Antonio's expansive clays; expect an engineered PT design.

    International Residential Code, 2024 · Chapter 5, FloorsRead the full text (opens UpCodes in a new tab)

Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.

Check your plans against these codes

Start an application and get every flag with its section and fix.

Start an application