Bars are fully embedded: joint reinforcement 5/8 in from the face, other bars one diameter and at least 3/4 in, or 2 in where exposed to weather or soil; ties carry the listed galvanizing.
Exterior braced panels under the roof only need schedule nailing when wind is 115 mph or less in Exposure B on 5:12 or steeper roofs spanning 32 ft or less, or net uplift is 100 plf or less; otherwise add uplift connectors.
The simplified speed-up table covers features up to 500 ft tall; on an escarpment the higher speed extends the greater of 1.5L or 6H downwind; a result of 140 mph or more means wind design is required.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.