Skip to content

Search the building code.

Every 2024 IRC section and the IBC as it loads, by number or topic, plus the local rules for your city. Free to search.

Detached houses, duplexes and townhouses up to 3 stories with their own exits use the IRC; every other building uses the IBC (IBC 101.2).

A random sample from 1,598 sections for San Antonio, TX, the 2024 IRC

Show another sample
  • R507.9.1.3

    Ledger to Band Joist Details

    • Ledger lag screws and bolts are 1/2 in, spaced per the table by joist span and load, with lag holes drilled 1/2 in through the ledger and 5/16 to 3/8 in into the band.
    • Ledger fasteners stay 2 in from the ledger top and ends and 3/4 in from its bottom, staggered, with rows 1-5/8 to 5 in apart; in the band, 3/4 in from top and 2 in from bottom.

    International Residential Code, 2024 · Chapter 5, FloorsRead the full text (opens UpCodes in a new tab)

  • R602.10.2.2

    Locations of Braced Wall Panels

    • The first panel starts within 10 ft of each end of a braced wall line, and panels are no more than 20 ft apart.

    International Residential Code, 2024 · Chapter 6, Wall ConstructionRead the full text (opens UpCodes in a new tab)

  • R1001.2

    Footings and Foundations

    • Fireplace footings are concrete or solid masonry at least 12 in thick, extending 6 in past the fireplace or wall on every side, on undisturbed soil or engineered fill below frost depth.

    International Residential Code, 2024 · Chapter 10, Chimneys and FireplacesRead the full text (opens UpCodes in a new tab)

Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.

Check your plans against these codes

Start an application and get every flag with its section and fix.

Start an application