Skip to content

Search the building code.

Every 2024 IRC section and the IBC as it loads, by number or topic, plus the local rules for your city. Free to search.

Detached houses, duplexes and townhouses up to 3 stories with their own exits use the IRC; every other building uses the IBC (IBC 101.2).

A random sample from 1,598 sections for San Antonio, TX, the 2024 IRC

Show another sample
  • R1003.9.2

    Spark Arrestors

    • A spark arrestor, where fitted, has four times the flue outlet's free area, a screen equal to 19-ga galvanized or 24-ga stainless, openings passing 3/8 in but not 1/2 in spheres, and is removable for cleaning.

    International Residential Code, 2024 · Chapter 10, Chimneys and FireplacesRead the full text (opens UpCodes in a new tab)

  • R602.3.5

    Braced Wall Panel Uplift Load Path

    • Exterior braced panels under the roof only need schedule nailing when wind is 115 mph or less in Exposure B on 5:12 or steeper roofs spanning 32 ft or less, or net uplift is 100 plf or less; otherwise add uplift connectors.

    International Residential Code, 2024 · Chapter 6, Wall ConstructionRead the full text (opens UpCodes in a new tab)

  • R602.10.5

    Minimum Length of a Braced Wall Panel

    • Most braced panels are at least 48 in long on 8 to 10 ft walls, 53 in at 11 ft and 58 in at 12 ft; let-in braces need 55 to 69 in.
    • Portal frames can be as narrow as 16 to 30 in by header height; ABW panels 28 to 42 in in SDC A-C.

    International Residential Code, 2024 · Chapter 6, Wall ConstructionRead the full text (opens UpCodes in a new tab)

Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.

Check your plans against these codes

Start an application and get every flag with its section and fix.

Start an application