Each exterior concrete wall line has enough solid full-height wall for wind (from tables, with reduction factors), in segments of 24 in or more, openings no wider than 18 ft, and a segment within 6 ft of each corner.
Lumber roof sheathing is at least 5/8 in at 24 in spacing; 1-1/2 in tongue-and-groove spans 48 to 72 in with stronger lumber; no spaced sheathing in SDC D2.
Combustibles stay 36 in from a masonry heater, with the space vented; with 8 in walls and 5 in channel walls the clearance drops to 4 in and 8 in to a combustible ceiling; listed heaters follow their listing.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.