Tied wythes use one 3/16 in tie per 4-1/2 sq ft (24 in vertical, 36 in horizontal), adjustable ties or joint reinforcement one per 2.67 sq ft at 16 to 24 in, plus ties within 12 in of openings.
Exterior concrete walls follow this section, PCA 100, ACI 318 or ACI 332, with light-frame interiors; drawings needn't be sealed unless state law says so.
Concrete walls connect to floors and roofs using the prescriptive details where the tables allow, proprietary connectors, or a design; wood framing must have specific gravity 0.42 or more.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.