Rafters and trusses are tied down for wind uplift, unless uplift is 200 lb or less per connection (on 0.42+ specific gravity framing), or wind is 115 mph or less in Exposure B on 5:12+ roofs up to 32 ft with 24 in spacing.
Polypropylene siding meets ASTM D7254, goes over 7/16 in sheathing with 0.120 in nails 3/4 in in, and isn't used within 5 ft of a lot line or 10 ft of a neighbour's building.
A chimney wider than 30 in parallel to the ridge that does not meet the ridge needs a flashed and counter-flashed cricket, its height a fraction of the width set by roof slope.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.