Chimneys up to 40 in wide get four continuous No. 4 vertical bars, grouted but kept from bonding to the flue liner; add two bars for each extra flue or each extra 40 in of width or part of it.
Concrete basement walls are braced top and bottom and get a No. 4 bar within 12 in of the top plus one at mid-height (8 ft or less) or at the third points (taller).
Vertical bars come from the tables by wall type, thickness, height, backfill and soil; walls retaining 4 ft or more are braced before backfilling, and 'DR' cells need a design.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.