In SDC C and D, an irregular building or portion must be engineered where the irregularity affects it.
Bracing may sit on a wood floor cantilever out of plane if the cantilever is no more than four joist depths and the joist, backspan and rim conditions are met.
A floor portion carrying no walls or roof may extend up to 6 ft past a braced wall line.
A braced panel ending more than 1 ft over an opening below is irregular unless the opening is 8 ft or less with a sized header.
A floor or roof opening is irregular when it's larger than 12 ft or half the least floor or roof dimension, whichever is smaller.
A hillside house is irregular when the slope is steeper than 1:5, the tallest cripple wall or post is over 7 ft, and under half the lower area is finished living space.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.