Portal frames with hold-downs (PFH), garage portals (PFG, SDC A-C) and continuous portals (CS-PF) follow their figures; a portal header spans only one opening.
Every bedroom, basement, habitable attic and room with a sleeping loft needs an operable escape opening to a public way or a yard that reaches one; each basement bedroom needs its own.
Exempt: mechanical-only basements of 200 sq ft or less, ICC 500 shelters, and sprinklered basement bedrooms where the basement has two exits.
Lumber subfloor end joints fall over supports (end-matched boards span two joists); 1 in tongue-and-groove strip flooring at 16 in may replace the subfloor.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.