Skip to content

Search the building code.

Every 2024 IRC section and the IBC as it loads, by number or topic, plus the local rules for your city. Free to search.

Detached houses, duplexes and townhouses up to 3 stories with their own exits use the IRC; every other building uses the IBC (IBC 101.2).

A random sample from 1,598 sections for San Antonio, TX, the 2024 IRC

Show another sample
  • R602.10.7

    Ends of Braced Wall Lines With Continuous Sheathing

    • Each end of a continuously sheathed braced wall line uses one of the end conditions in Figure R602.10.7.

    International Residential Code, 2024 · Chapter 6, Wall ConstructionRead the full text (opens UpCodes in a new tab)

  • R404.1.3.2

    Reinforcement for Foundation Walls

    • Concrete basement walls are braced top and bottom and get a No. 4 bar within 12 in of the top plus one at mid-height (8 ft or less) or at the third points (taller).
    • Vertical bars come from the tables by wall type, thickness, height, backfill and soil; walls retaining 4 ft or more are braced before backfilling, and 'DR' cells need a design.

    International Residential Code, 2024 · Chapter 4, FoundationsRead the full text (opens UpCodes in a new tab)

  • R1002.4

    Seismic Reinforcing

    • In SDC D0 to D2 a masonry heater is anchored to its foundation; its body needs no reinforcing if no taller than 3.5 times its width and not carrying the chimney, but a chimney sharing a wall with it is reinforced.

    International Residential Code, 2024 · Chapter 10, Chimneys and FireplacesRead the full text (opens UpCodes in a new tab)

  • R702.3.7

    Water-Resistant Gypsum Backing Board

    • Tile backer drywall meets ASTM C1178, C1278 or C1396; water-resistant board is fine on ceilings but never over a Class I/II vapor retarder in a shower, in direct water or constant humidity, and cut edges are sealed.

    International Residential Code, 2024 · Chapter 7, Wall CoveringRead the full text (opens UpCodes in a new tab)

Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.

Check your plans against these codes

Start an application and get every flag with its section and fix.

Start an application