Concrete basement walls are braced top and bottom and get a No. 4 bar within 12 in of the top plus one at mid-height (8 ft or less) or at the third points (taller).
Vertical bars come from the tables by wall type, thickness, height, backfill and soil; walls retaining 4 ft or more are braced before backfilling, and 'DR' cells need a design.
In SDC D0 to D2 a masonry heater is anchored to its foundation; its body needs no reinforcing if no taller than 3.5 times its width and not carrying the chimney, but a chimney sharing a wall with it is reinforced.
Tile backer drywall meets ASTM C1178, C1278 or C1396; water-resistant board is fine on ceilings but never over a Class I/II vapor retarder in a shower, in direct water or constant humidity, and cut edges are sealed.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.