In SDC D, plain masonry foundation walls are at most 8 ft tall with 4 ft of backfill, at least 8 in thick, with No. 4 verticals at 4 ft and two No. 4s in the top 12 in.
Drywall edges land on framing (except edges across it), and interior drywall never goes where weather or water hits it directly.
Without adhesive, drywall nails go 7 in apart on ceilings and 8 in on walls, screws 12 in (16 in on 16 in walls); framing is 16 in for 3/8 in board and up to 24 in for 1/2 and 5/8 in.
5/8 in Type X on a garage ceiling under living space runs across 24 in framing with fasteners at 6 in.
With adhesive, fastener spacing opens to 12-16 in on ceilings and 16-24 in on walls; two-layer 3/8 in work nails the base ply and glues the face.
Ceilings getting water-based texture use 1/2 in board on 16 in framing or 5/8 in (or sag-resistant 1/2 in) on 24 in, laid across the joists; 3/8 in can't hold insulation or texture.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.