Skip to content

Search the building code.

Every 2024 IRC section and the IBC as it loads, by number or topic, plus the local rules for your city. Free to search.

Detached houses, duplexes and townhouses up to 3 stories with their own exits use the IRC; every other building uses the IBC (IBC 101.2).

A random sample from 1,598 sections for San Antonio, TX, the 2024 IRC

Show another sample
  • R404.1.3.3.6.1

    Stay-in-Place Forms

    • Foam stay-in-place forms are covered inside with a thermal barrier (gypsum fastened mechanically) and outside with siding; flat ICF forms meet ASTM E2634.

    International Residential Code, 2024 · Chapter 4, FoundationsRead the full text (opens UpCodes in a new tab)

  • R306.3.2

    Elevation Requirements

    • In V and Coastal A zones, the underside of the lowest floor framing is at least 1 ft above base flood or at design flood, whichever is higher.
    • Coastal detached accessory buildings below flood level are capped at 100 sq ft, one story, storage or parking.

    International Residential Code, 2024 · Chapter 3, Building PlanningRead the full text (opens UpCodes in a new tab)

  • R602.10.5

    Minimum Length of a Braced Wall Panel

    • Most braced panels are at least 48 in long on 8 to 10 ft walls, 53 in at 11 ft and 58 in at 12 ft; let-in braces need 55 to 69 in.
    • Portal frames can be as narrow as 16 to 30 in by header height; ABW panels 28 to 42 in in SDC A-C.

    International Residential Code, 2024 · Chapter 6, Wall ConstructionRead the full text (opens UpCodes in a new tab)

Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.

Check your plans against these codes

Start an application and get every flag with its section and fix.

Start an application