Footing rebar is Grade 40 or better, tied in place, with 3 in of cover against earth, 1-1/2 in (No. 5 and smaller) or 2 in in formed exposed concrete, and 3/4 in otherwise.
Masonry foundation walls are sized from the plain or reinforced tables by wall height, backfill height and soil class; rubble stone isn't allowed in SDC D or for townhouses in C.
Unbalanced backfill is measured from outside grade down to the footing top or inside grade, or to the top of an interior slab bearing against the wall.
An operable window with its sill under 24 in from the floor and more than 72 in above outside grade must limit the opening to 4 in or have an ASTM F2090 device.
Siding thickness and nailing follow Table R703.3(1) and the maker's instructions, based on 16 in studs; screws replace nails on steel (No. 6, 7 or 8 for 0.099, 0.113 or 0.120 in nails).
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.