A 3-hour horizontal assembly over a sprinklered Type IA podium makes the parts above and below separate buildings ('podium'), with 2-hour shaft enclosures, A/B/M/R/S above, no H below, and height limited by the lower allowance.
Group S-2 enclosed parking garage with Group S-2 open parking garage above
A one-story Type I/II enclosed garage under an open garage is a separate building for construction type, with area ratios ≤ 1, tiers per Table 406.5.4 and up to 1,000 sq ft of office/waiting/toilet.
Group B or M buildings with Group S-2 open parking garage above
B or M below an open garage of lesser type is a separate building with a 2-hour horizontal assembly, Type IA below (IB/II if one story), and garage exits discharging directly at grade.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.