Skip to content

Search the building code.

Every 2024 IRC section and the IBC as it loads, by number or topic, plus the local rules for your city. Free to search.

Detached houses, duplexes and townhouses up to 3 stories with their own exits use the IRC; every other building uses the IBC (IBC 101.2).

2 sections matching “IBC 508.3.2” for San Antonio, TX, the 2024 IBC

  • IBC 508.3.2

    Allowable building area, height and number of stories

    • Area, height and stories use the most restrictive occupancy present.

    Works withIBC 503.1

    International Building Code, 2024 · Chapter 5, General Building Heights and AreasRead the full text (opens UpCodes in a new tab)

  • IBC 506.2.2

    Mixed-occupancy buildings

    • Mixed buildings use 508.3.2 or 508.4.2 per story; above three stories the sum of each story's actual/allowable ratios may not exceed 3 (4 with 13R and separated occupancies).

    Works withIBC 508.3.2IBC 508.4.2

    International Building Code, 2024 · Chapter 5, General Building Heights and AreasRead the full text (opens UpCodes in a new tab)

Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.

Check your plans against these codes

Start an application and get every flag with its section and fix.

Start an application