Alternative materials, design and methods of construction and equipment
Materials, designs and methods not prescribed by the code may be approved if not prohibited; ICC Performance Code designs are an option except for structural alternatives.
A scaled site plan from a boundary survey shows new and existing structures, distances from lot lines, street and finished grades, and any flood areas and design flood elevations.
A permit expires if work doesn't start within 180 days or stops for 180 days; written extensions up to 180 days each.
Local review: Cities usually replace Chapter 1 with their own administrative rules. In San Antonio, permits, fees, time limits and inspections follow the city's adopted amendments and DSD procedures; confirm there before relying on these.
Searches all 4,276 IRC 2024 sections, 5,532 IBC 2024 sections and defined terms (Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33 so far) and each city's local rules as they are added. Section numbers and titles from the International Residential Code and International Building Code, 2024 editions, copyrighted by the International Code Council; the IRC's electrical chapters (34 to 43) follow NFPA 70, the National Electrical Code. Requirements are summarized in our words (IRC Chapters 3 to 43, IBC Chapters 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33); read the full text at the link on each result. Local values come from each city's published documents.
Check your plans against these codes
Start an application and get every flag with its section and fix.